Killardry Bridge

The parapet is the wall meant to keep a vehicle on the bridge. 1.25 m — the height the parapet should have stood. 0.23 m — at the point of impact: capping “partly removed”, a 5 m length collapsed (TCC engineering inspection, 21 Jan 2025). ~4.3 m — the drop to the River Aherlow (DWA forensic survey, May 2025). 60 km/h — posted limit, cut from 80 km/h on 7 February 2025 — eleven weeks before.

The removal of the capping is recorded in Tipperary County Council’s own engineering inspection of 21 January 2025 (rated “Significant Damage”, ref TY-L3151-B-010, which states that “the capping of the downstream wall has been partly removed”). Presented so the public can see the wall’s condition. This does not determine legal liability.

Illustrative, drawn to the recorded measurements; states no fault or causation.

From the record

The wall — where the capping was removed
The family’s photographs of the exact place, with the council’s inspection wording.
The approach: works, bank and drainage
Dated views of the approach and the council’s written account.
Where the case is decided
The measured wall-height record.
Kilmoyler: location, history and protected-structure record
NIAH and RPS entries for the bridge.
2014 to 2026: a €450 parapet repair the Council said in February 2026 was still not carried out
The inspection-to-repair chain, sourced.
Cahir–Cashel: the bridge record, member by member
One page per elected member of the municipal district.

Factual record. No finding of causation or responsibility is made here.

Road Death Tipp

Tipperary road deaths — remembrance and records

Remembrance and the official records, county by year.

Open the map

Partial map coverage. No ages shown.

Partial map coverage. No ages shown.

Contact the family

If you have information about this road, this bridge, or the records on this site, you can write to Bronagh's family here.

Sent only to the family. Not shared, not stored by any third party.